Power and load tables

Unit, load schedule, demand and power-record tables used beside Australian electrical calculators.

  • 4 tables
  • Australia

Power and load tables project basis

Unit, load schedule, demand and power-record tables used beside Australian electrical calculators. These tables identify units, field names and source values before a calculator run or worksheet review.

More

Confirm the nominal 230/400 V a.c. or project-specific voltage basis, 50 Hz context where applicable, phase arrangement, metric units, manufacturer information, DNSP or authority conditions and current project documents before applying a result.

Use table values only with the current project documents, product data and applicable Australian requirements that control the final decision.

Records covered

  • Electrical unitsCommon V, A, kW, kVA, kVAr, kWh, ohm, m, mm2, percent and A2s labels used by AUWiring calculators.data-table · 2026-07-13
  • Common load examplesAustralian load-record examples for lighting, socket, motor, EV and mechanical load worksheets.data-table · 2026-07-13
  • Load schedule fieldsField list for recording Australian switchboard load schedule inputs before using load and maximum-demand calculators.field-table · 2026-07-13
  • Demand factor source logSource-log fields for recording where demand factors and diversity assumptions came from in Australian load worksheets.field-table · 2026-07-13

Review before applying

Power and load tables support calculator inputs and worksheet context. Keep each lookup beside the current project documents, Australian requirements and the calculator page that owns the final entered result.

Recheck the selected table whenever the supply arrangement, equipment data, route length, tariff basis, measurement method or project document set changes.