Cable derating worksheet fields

Worksheet fields for recording cable derating inputs beside Australian cable sizing reviews without publishing derating factor tables.

  • Cable and voltage · Worksheet fields
  • High-sensitivity table
  • Last checked 13 July 2026

Derating evidence needed before cable checks

List derating record fields while leaving factor selection to the governing source and project review.

Derating worksheet fields
FieldPurposeTypical sourceBoundary
Base capacity sourceRecords where the starting ampere value came from.Current source document or project reviewThis page does not publish capacity values.
Installation methodTies the capacity basis to how the cable is installed.Design note, route drawing or source documentChanging method can change the applicable value.
Grouping contextRecords whether nearby circuits affect the review.Cable route and scheduleNo grouping factor is stated here.
Ambient or soil conditionKeeps environmental assumptions visible.Project assumption or site dataEnvironmental correction needs governing source values.
Applied factor recordShows which project-entered factors were applied.Reviewer worksheetFinal selection still needs a documented project basis.
  • This table is a worksheet field list.
  • Derating factors and final capacity decisions must come from current governing sources.

How derating fields frame project inputs

Capture the installation conditions that affect derating so the calculator result can be reviewed against the actual run and enclosure context.

Where derating judgement still sits
ItemValue
PurposeList derating record fields while leaving factor selection to the governing source and project review.
How to use the sourceField table only; any derating arithmetic must use project-entered source values and calculator logic.
Standards and project contextAS/NZS 3008 context noted for project review; verify current source documents and installation conditions.
Where judgement is still neededUse this table for lookup, labelling or worksheet context; do not treat it as a project-specific calculation result.
Before relying on itConfirm current standards, local authority requirements, DNSP conditions, project documents and manufacturer data before relying on a decision.

Standards basis for derating records

Keep the standards context, checked date and project condition behind each derating entry visible for review.

Derating worksheet fields source basis
ItemValue
SourceAUWiring cable-size calculator fields and AS/NZS 3008 derating-source context.
Source typeAUWiring field model with standards context
Derivation basisAUWiring worksheet field table; derating factors and controlled source tables are not reproduced.
Last checked2026-07-13
Review intervalAnnual or when cable-size fields, derating source context or installation-record practice changes.
Review triggerCalculator field change, standards update, installation-method change or project feedback.
Version usedR07-2026-07-13
Australian applicationAustralia; project conditions, product data, route context and local authority requirements can override general notes.