Final Subcircuit Maximum Demand Calculator

Estimate one final subcircuit demand from point counts, fixed-load contribution and explicit project factors.

Inputs

Project inputs and assumptions

Range: 0–10,000 count

Enter the number of socket or general-purpose points included in this circuit.

Range: 0–100,000 VA

Enter the allowance selected for this circuit method; no standard allowance is assumed.

Range: 0–10,000 count

Enter the number of lighting points on the final circuit.

Range: 0–100,000 VA

Enter the electrical input allowance per lighting point.

Range: 0–100,000 kW

Enter the connected fixed load assigned to this circuit.

Range: 0–100 %

Enter the selected factor for simultaneous operation of the fixed load.

Range: 1–100,000 V

Use the phase-to-neutral voltage for this final-circuit estimate.

Range: 0.01–1

Use the expected circuit power factor for converting VA to current.

Result

Connected circuit load (VA)
3,380.00
Estimated final-circuit current (A)
12.72
Estimated final-circuit demand (VA)
2,780.00

Formula

Calculation logic

Formula definitions and substituted values.

Before relying on the result

  • Estimate a socket and lighting final circuit
  • Check a fixed appliance contribution before selecting circuit protection
  • Use the applicable circuit category, appliance data and current Wiring Rules method; this calculator only applies the entered point and diversity assumptions.

Related calculators

Use the applicable circuit category, appliance data and current Wiring Rules method; this calculator only applies the entered point and diversity assumptions.