Record each electrical test result against the installation, switchboard, circuit and test point it belongs to. Keep the measured value, unit, test conditions and acceptance criterion together so another person can understand what was tested and how the result was assessed.
The blank schedules below can be copied into a project document or spreadsheet. They organise supporting inspection and test evidence; they are not an official certificate or an automatic compliance assessment.
Queensland’s Guide for testing low voltage electrical installations identifies test sheets, instrument logs, software records, photographs and checklists as possible recording methods. Select a recording method that does not distract from the inspection and testing work.
Project and test-session record
Complete one project record, then identify each testing session separately where the date, personnel, instruments or supply configuration changes.
| Field | Entry |
|---|---|
| Project or job number | |
| Record number and revision | |
| Customer or organisation | |
| Installation address | |
| Description of work and extent tested | |
| Switchboard identifiers and locations | |
| Relevant drawings and circuit-schedule revisions | |
| Supply and earthing arrangement | |
| Alternative supplies and operating configuration relevant to testing | |
| Test date and session identifier | |
| Person performing the tests | |
| Electrical worker licence details, where applicable | |
| Electrical contractor name and licence number, where applicable | |
| Applicable inspection and test procedure references | |
| Exclusions, inaccessible areas and incomplete work | |
| Related inspection, defect and certificate references |
Describe the extent tested precisely. “New final subcircuit from DB1, circuit 12, including all connected outlets” is more useful than “electrical work tested”. Identify work outside the recorded extent rather than allowing the record to imply that the whole installation was assessed.
Supply configuration also matters. Where the installation has solar, batteries, a generator or another supply, record the configuration relevant to each test. A result obtained in one configuration should not be presented as evidence for an untested configuration.
Instrument register
Assign each instrument a short identifier and use that identifier against individual results.
| Instrument ID | Manufacturer and model | Serial number | Test functions used | Calibration or verification reference and date | Function-check record reference |
|---|
Record the status that actually applies to the instrument. Do not describe it as calibrated solely because it passed a pre-use function check.
Queensland’s guidance distinguishes checking correct operation from maintaining measurement performance. Its testing-equipment guidance notes that checking arrangements depend on the instrument and may require specialist testing.
Where lead resistance, a zero adjustment or another correction affects the reported result, retain the correction with the test conditions. Preserve the original reading as well as any corrected value.
Circuit and protective-device schedule
Use the same switchboard and circuit identifiers throughout the record. Give individual outlets, equipment items or test points their own identifiers where several results belong to one circuit.
| Switchboard ID | Circuit ID | Circuit description and extent | Protective-device manufacturer and reference | Rated current and trip curve or settings | RCD details, if fitted | Drawing or schedule reference |
|---|
For a residual current device (RCD), record its device type, rated residual operating current and any time-delay characteristic relevant to the assessment. Keep the circuit rated current separate from the RCD’s residual operating current; they describe different quantities.
Inspection and test-result schedule
Use one row for each distinct measurement or observation. Repeat rows for different test points, conductor combinations, test settings or operating conditions.
| Result ID | Switchboard / circuit / test point | Inspection or test | Method and conditions reference | Reading or observation | Unit | Criterion reference | Assessment | Instrument ID | Tester and date |
|---|
Keep observations separate from numerical measurements. Polarity, circuit identification and correct connections may require a recorded observation rather than an invented numerical value.
For assessment, use explicit descriptions such as:
- Meets the stated criterion.
- Does not meet the stated criterion.
- Assessment pending.
- Not tested — reason recorded.
- Not applicable — basis recorded.
“Meets the stated criterion” applies only to that result and its recorded conditions. It is not a declaration that every aspect of the circuit or installation complies.
Conditions to retain for different tests
The result schedule is a common record format, not a mandatory testing sequence. Determine the required inspections, tests and methods from the requirements applicable to the work. Queensland’s low-voltage testing guide addresses visual inspection, earthing continuity, insulation resistance, polarity and circuit connections, phase sequence, fault-loop verification and RCD operation. It also identifies installations with additional or alternative testing requirements.
Use the following prompts to make the selected tests traceable.
| Test or inspection | Details to record with the result |
|---|---|
| Visual inspection | Item and location inspected, extent accessible, observation, defect reference and supporting photograph or checklist reference |
| Earthing continuity | Conductor or bonding path, test endpoints, method, instrument mode, lead compensation and resistance in Ω |
| Insulation resistance | Circuit extent, conductor combination, selected DC test voltage, equipment disconnected or otherwise treated under the procedure, and result in MΩ |
| Polarity and correct circuit connections | Location, conductors or terminals checked, method, relevant switch positions and observation |
| Phase sequence | Test location, phase identification, method and observed sequence |
| Earth fault-loop verification | Test location, live measurement or alternative verification method, supply configuration, instrument mode and value in Ω |
| RCD operation | Exact device, circuit or circuits protected, test method, selected test settings, result and verification observations |
These prompts do not supply default test voltages, resistance limits or operating times. Enter the conditions and criteria appropriate to the actual test rather than carrying values across from an unrelated circuit.
RCD records: identify the method
A test-button operation and an instrument-measured operating time are different records. If the integral test button was used, record that method and its observations; do not enter a trip time that was not measured.
For instrument testing, record the applied residual current or multiplier, waveform or device-type setting, phase-angle setting where used, and the measured time or ramp-test current. Use separate rows where the settings change.
Queensland’s guide distinguishes operation by the integral test device from operation using special test equipment and requires verification that the switched poles have isolated the designated circuit. Record that verification separately from any displayed operating time.
Acceptance-criteria register
Give each criterion a reference that can be used in the result schedule.
| Criterion ID | Test or assessment | Requirement or limit, including units and inequality | Source, edition or revision, and clause / table / page | Conditions and applicability |
|---|
“AS/NZS 3000” alone is not a sufficiently precise reference for a numerical limit. Identify the applicable edition and the provision or table used. For manufacturer criteria, retain the document reference, revision and exact device or configuration.
Keep the comparison direction explicit. A minimum resistance and a maximum operating time require opposite inequalities. If the source states a strict inequality, do not silently convert it to an inclusive one.
Preserve instrument display qualifiers. For example, a reading displayed as “>200 MΩ” should remain “>200 MΩ”, not “200 MΩ”. Record “overrange”, “no trip” or an instrument error as shown, with the test conditions; none is a substitute for an assessed result.
Where the criterion has not yet been established, retain the measurement and mark the assessment pending. Do not assign a pass from the instrument display alone.
Defects, corrective work and retesting
Retain the original result when corrective work is performed. Add a linked retest result rather than overwriting the earlier reading.
| Defect ID | Original result ID | Defect or unresolved issue | Circuit status or restriction | Corrective work reference | Retest result ID and date | Outstanding action / closure record |
|---|
Identify any change between the original test and retest, including replaced equipment, altered settings, changed connections or a different test method. If completion of the work affects other verification results, record the additional checks undertaken.
Use the circuit-status field to describe its actual condition, such as isolated or incomplete, with a reference to the relevant isolation or handover record. Do not let a blank result imply that the circuit was tested and accepted.
Record completion and handover
| Field | Entry |
|---|---|
| Results and attachments included | |
| Outstanding tests, defects or exclusions | |
| Completed by and date | |
| Reviewed by and date, if a review was performed | |
| Related certificate or notification reference, where required | |
| Record issued to and date | |
| Storage location and retention requirement reference |
A review entry records an action actually performed; it does not imply independent inspection or professional certification.
Keep statutory certificates separate from these supporting schedules. Queensland, for example, distinguishes a certificate of testing and compliance for electrical installation work from a certificate of testing and safety for electrical equipment work. Its official certificate template includes customer details, the installation or equipment tested, the test date, contractor licence details and the relevant certification statement. The schedules above do not replace that certificate.
Queensland’s regulator states that contractors must retain certificate copies for five years; its low-voltage testing guide also recommends keeping inspection and test results for five years. These are distinct statements about certificates and supporting evidence, not a national retention rule for every electrical record. Set the project’s retention arrangement using the applicable jurisdictional and contractual requirements, and keep the results linked to the relevant certificate and work record.